Emergency Repairs to Clear Creek Second Outlet and Gated Structure After Hurricane Ike

Huitt-Zollars conducted a site survey and prepared plans, specifications and cost estimates for repairs to the access road and Gated Structure at the Clear Creek Second Outlet in Seabrook, Texas.  The road and structure sustained significant damage from Hurricane Ike. Huitt-Zollars performed a condition assessment inspection and a topographic survey.  Huitt-Zollars also prepared construction drawings and specifications for the reconstruction of the access road, repair and replacement of the handrails and walkway support system, replacement of the upper and lower protective stem covers and replacement of the sanitary sewer tank.  Design submittals were made at the 65%, 90%, and 100% milestones.  The construction documents identified the project area as well as plan views, cross-sections, and details required for the repairs.  A MII cost estimate was prepared and submitted with the 90% and 100% submittals.  The drawings, specifications and cost estimate were prepared in accordance with applicable USACE Technical Manuals, Criteria and Standards.  Huitt-Zollars prepared and submitted a Design Documentation Report in accordance with ER 1110-2-1150 for the 90% and 100% submittals.  Huitt-Zollars participated in Technical Reviews; an Over-the-Shoulder Review and a Biddability, Constructability, Operability, and Environmental (BCOE) Review with members of the District’s Project Team.  The project was completed ahead of schedule.  Estimated construction cost: $127,285.00

Emergency Repairs to Clear Creek Second Outlet and Gated Structure After Hurricane Ike
Seabrook
Client
U.S. Army Corps of Engineers Galveston District, Texas