Barker Cypress Bridge

  • .

Huitt-Zollars prepared a preliminary engineering report and final design construction documents and provided construction phase services for the construction of Barker Cypress Road and a five-span, pre-stressed concrete beam bridge across Cypress Creek. The roadway is an asphalt boulevard with a raised median and storm sewer drainage. Additional services performed included surveying (topographic, alignment, abstracting, metes and bounds), geotechnical investigations, environmental investigations, HEC drainage analysis, preparation of Conditional Letter of Map Revision and Letter of Map Revision to FEMA, traffic control plans, storm water pollution prevention plan, pavement markings, signage, cost estimating and utility coordination. The project includes new signalization at the intersection of Jarvis Road and Barker Cypress Road.

Barker Cypress Bridge
Harris County
Client
Harris County