Huitt-Zollars provided preliminary and final engineering services, preparation of conceptual grading, drainage and utility plan, preliminary water quality management plan, preliminary drainage study, and construction administration for the 57,000 square-foot commercial/retail development and parking lot. Final construction drawings included precise grading, storm drain, sewer, water, firewater, and associated support calculations. Site design included a 10,000 cubic-foot underground infiltration chamber system that reduces stormwater outflow and removes potential pollutants from stormwater that is discharging into the downstream storm drainage system. The infiltration chamber system design allowed the developer to maximize the property while complying with city and state guidelines.
Chino Hills Gateway Village
Chino Hills
Client
Treh Partners, LLC