Huitt-Zollars provided services on three separate electric charging projects:
6 dual EV NRV’s and Employees’ Personal Vehicles: Employee parking lot expansion/re-striping of the existing lot, included 6 dual EV chargers. Work also included concrete paving, lighting, drainage (collection, conveyance, treatment, disposal), security landscape, ADA improvements. As the prime consultant, our services included PS&E, bid documents, permitting, SEPA/NEPA, design survey, and bidding.
30 Electric Bus Chargers: Bus base master plan improvements including preliminary design, SEPA/NEP, master plan preparation, final PS&E, and cost estimating.
6 Duel Electric Bus Chargers Maintenance Function: Bus base master plan improvements, preliminary design, SEPA/NEPA, master plan preparation, final PS&E, and cost estimating.