Cabezon Wastewater Treatment Plant Reservoir and Booster Station

Huitt-Zollars is providing construction design and management services for a new 3 MG concrete reservoir and new 6 MGD water reuse system booster station located at the Cabezon Wastewater Treatment Plant #6. The construction of the 3 MG reuse storage tank includes a concrete foundation, inlet piping, outlet piping, overflow and drain lines, and special coatings for protection. The 6 MGD booster station, housed in a climate controlled 2,800-square-foot building, includes variable-speed can-style turbine pumps, motors with variable speed drives, valves, piping, automated controls, and a standby electric generator to ensure uninterrupted operation. The City has spent considerable time planning and implementing a city-wide water reuse system. Collectively, these facilities are part of the backbone reuse system and make a major contribution to the overall plan.

Cabezon Wastewater Treatment Plant Reservoir and Booster Station
Rio Rancho
Client
City of Rio Rancho