Huitt-Zollars served as prime design firm, with management responsibilities plus technical responsibilities for architecture, structure, mechanical (including HVAC and piping/plumbing) and electrical engineering. The new facility consolidates multiple functions into a single 377,000-SF seven-building facility on approximately 15 acres of site development. In addition to building and site design, Huitt-Zollars was responsible for programming, layout, and design of approximately $20 million of highly specialized process-related equipment. Extensive value engineering was provided at the project definition phase and during final project design, demonstrating the ability to successfully manage and design major building projects.
Maneuver Systems Sustainment Center - Red River Army Depot
Texarkana
Client
U.S. Army Corps of Engineers