Lakewood Drive Roadway and Bridge
Huitt-Zollars, as the bridge consultant, provided engineering design for the preparation of construction plans, specifications, and estimates for a new bridge and approaches located over Little Bear Creek. The new, higher approach on the north end of the bridge ties into the FM 1626 roadway widening project located at the intersection of Lakewood Drive. This intersection is within 150 feet of the end of the Lakewood Drive Bridge. Huitt-Zollars’ tasks included the creation of a bridge layout and design of all superstructure and substructure elements and foundations.